M3NERGY FPSO PERINTIS SDN BHD (Formerly known as Trenergy FPSO Sdn Bhd)
M3nergy FPSO Perintis Sdn Bhd incorporated in 1997, is a wholly owned subsidiary of M3NERGY Berhad. It was established to spearhead the Group's foray into the upstream oil and gas sector. Fully committed to the aim of becoming a dominant player in the industry, M3nergy FPSO Perintis Sdn Bhd has invested substantially in shaping and harnessing its FPSO/FSO engineering, project management, operations and maintenance capabilities. A 9-year leasing contract with Petronas Carigali saw the emergence of FPSO Perintis, which started production in May 1999 in the MASA oilfield, situated about 155 kilometers offshore from Terengganu, Malaysia.
OUR INDUSTRY
  • Oil and gas

BUSINESS ACTIVITIES

  • Provision of FPSO / FSO facilities
  • Operation and maintenance of floating and fixed offshore facilities
  • Process plant operations
  • Marine systems operations
  • Plant machinery maintenance
  • Provision of maintenance support services
  • Onshore supply base support

INDUSTRY OUTLOOK

  • Positive growth in the oil and gas industry internationally
  • Development of marginal and remote deepwater oilfields
  • Increasing participation of local companies
  • Deployment of advanced and leading-edge technologies

COMPETITIVE STRENGTHS

  • Proven track records of performance
  • Highly competent and experienced engineers and related professionals
  • Established operating system
  • Excellent health, safety and environmental record
  • A completely Malaysian owned, operated and fully integrated FPSO

MAIN FUNCTION OF FPSO PERINTIS

  • Receipt of fluid from subsea wells
  • Control of subsea wells
  • Processing of incoming fluids for separation into crude, water and gas
  • Storage of stabilised crude and maintaining it at the required temperature
  • Treatment of effluent for discharge of water to the sea
  • Chemical injection
  • Offloading of crude into "tandem moored" shuttle tankers
  • Power generation for process, offloading, utilities and ship systems
  • Provide accommodation for operation and maintenance personnel- Provide helideck for helicopter operations
  • All systems are designed for an annual average production uptime of 96% minimum.

HomeNewsroom | Career | Contact Us | Links Copyright © 2008 M3nergy